Here's my old Finish-Along list for the 2nd quarter. I'm updating it as of today. Pics forthcoming. So far 9/14 with #10 on the roster to do today.
1. Red, Grey, Black Quilt from bee blocks. Still sitting in the snap frame. haven't been handquilting it.
2.
3.
4.
5.
6. Postage Stamp quilt. No real progress made.
7.
8. The Lawn Chairs Quilt #2. Still needs to be basted. Front and Back are done.
9. The boxy bag for Trollop. On to do list for today.
10.
11.
12. P
13.
14. Stained Quilt. The top is done.