Pages

Tuesday, October 8, 2019

My Quarter 3 Finishes

Whelp.

I don't have many finishes.  I posted my goal list here.

I've made progress on a bunch.

Here are the only official finishes:

Lucky Spool Quilt...binding on! (Better pics later)
big quilt


Tote bags.  3 done!
tote bags

Journal covers for book group:  Five done!
journals

new knitting pouches
knitting pouches

Here's my progress made list:

Rosalie Dace's class Kuba-inspired quilt: The center diamond is done.  I have gotten an order of cocoa colored linen for the border.

Kuba inspired

Tula Nova All-Star quilt:  All pieced but one medallion.  Now to applique it to my base.
Nova All Stars

Tara Faughnan purple triangle quilt:  It's now a top!
Purple Triangle quilt

Sarah Bond's pickle dish quilt:  One set of arcs left to do and then sewing into blocks!
Pickle Dish

Curve quilt from class with Jen Carlton-Bailey, quilt 1:  top complete!
Jen Carlton-Bailey class

Curve quilt from class with Jen Carlton Bailey, quilt 2:  top complete!
Jen Carlton-Bailey class


Tula Christmas quilt (July):  top complete!
Tula Christmas

Tula cross quilt (August):  top complete!



Tula September Dos Cuadrados quilt:  top complete!



Evie Twist quilt  (this one was the class example, NOT MINE):  blocks mostly pieced
Evie Twister (class example, not mine)


You are Enough quilt.  Top is now done: getting long armed
IAMENOUGH quilt



Tulapalooza April quilt (Sweet Tea):  quilt at long armer
Sweet Tea

Tulapalooza June quilt Cobblestones:  Quilt at long armer
Cobblestones


Do. Good. Stitches Jewel Box quilt:  top done!


Fussy Cut Sampler : top complete!




Linking up what I've gotten done.  I'm not super optimistic about next quarter's finishes since this one was kind of a dud. Sigh.